You’ve shortlisted two or three builders. The portfolios look good, the conversations went well, and now you need to check that what they’ve told you holds up.
Talk to Our Director About Your Luxury Home
This is the step most people rush, and it’s the one that’s changed most. Victoria replaced its building regulator in July 2025 and its insurance scheme in July 2026. Builders can now be ordered to fix defective work for a decade after your house is finished.
Most checklists still circulating online predate all of it. If you’re working through how to identify the best luxury home builders in Melbourne, that guide covers what to ask and what to look for. This one covers what to verify, and how.
On 1 July 2025, the Victorian Building Authority was replaced by the Building and Plumbing Commission.
This wasn’t a rename. The BPC brought together three separate bodies that used to handle different parts of the same problem:
Previously, if your builder was unregistered you dealt with one body. If you had a dispute, another. If you needed to claim, a third. Now it’s one regulator.
The change came through the Building Legislation Amendment (Buyer Protections) Act 2025, which received Royal Assent in June 2025.
When you verify a builder, you’re checking the BPC’s register, not the VBA’s. If a guide tells you to search the VBA site, it was written before July 2025 and may be wrong about other things too.
Worth confirming while you’re there: that the registration covers domestic work rather than commercial only, and that the registered entity name matches the name on your quote.
From 1 July 2026, the First Resort Home Warranty Scheme replaced the old domestic building insurance arrangement.
This is the change that matters most to homeowners, and it’s the one least understood.
Domestic building insurance generally paid out only when the builder had died, disappeared or become insolvent. If your builder was still trading and the work was defective, the insurance didn’t help. You were in a dispute, not a claim.
That’s why it was sometimes called last-resort cover.
Home Warranty insurance covers eligible residential work on buildings up to three storeys where the contract value is $20,000 or more. Cover extends to:
The significant words are first resort. You no longer need the builder to have collapsed before the cover responds.
You should receive a certificate of insurance before paying any deposit. Ask for it, and check the details match your contract.
One thing that hasn’t changed: if a builder isn’t properly registered, the work can’t be covered. Registration and insurance are linked, which is why verifying registration is worth the five minutes it takes.
This is the provision almost nobody is talking about, and it’s arguably the strongest consumer protection Victoria has introduced.
The BPC can issue rectification orders directing builders, subcontractors and developers to fix poor work. The orders can be issued at any point during construction, and for up to 10 years after the date of practical completion.
The window is the point. Defects in waterproofing, structure and drainage often don’t surface in the first year or two. A protection that expires at handover misses most of them.
The Domestic Building Contracts Amendment Act 2025 raises the threshold for a Major Domestic Building Contract from $10,000 to $20,000, along with other changes to deposits and progress payments.
Regulations were still in consultation as of late October 2026, so check the current position before relying on a specific figure. For anything beyond a modest renovation you’ll be above the threshold regardless.
What to read closely in any contract: the variations clause, the progress payment schedule, and what happens to the timeline if council assessment runs long.
Information statements. Building surveyors must now give you an information statement within 10 working days of issuing your building permit, explaining their role and responsibilities.
Building manuals. From 1 February 2027, new Class 1b, 2 and 3 buildings apartments, boarding houses, larger residential building will need a building manual recording design, construction and subsequent works. Standalone houses aren’t affected.
Developer bonds. For apartment buildings of four storeys and above, developers will need to lodge a bond with the BPC before applying for an occupancy permit. It applies to projects with a building permit issued after 1 July 2027.
Further changes are coming. The Building and Plumbing Administration and Enforcement Act 2026 passed Parliament in May 2026 and is expected to commence during 2027.
See Our Completed Projects Across Melbourne
Five things, in order:
Verification tells you a builder is legitimate. It doesn’t tell you they’re right for your project. For that, our guide to the best luxury home builders in Melbourne covers how to assess process, accountability and workload, and our luxury home building service sets out how we approach it.
Contact us today for a free consultation and expert advice.
The Building and Plumbing Commission, from 1 July 2025. It combines the former VBA, Domestic Building Dispute Resolution Victoria, and the domestic building insurance arm of the VMIA into a single regulator.
The First Resort Home Warranty Scheme, which replaced domestic building insurance on 1 July 2026. It covers eligible residential work on buildings up to three storeys where the contract value is $20,000 or more, including lost deposits, incomplete work and defective or non-compliant work.
The old scheme generally only responded if the builder died, disappeared or became insolvent. Home Warranty cover is first resort, so it responds to incomplete and defective work without that precondition.
The BPC can issue a rectification order at any time during construction and for up to 10 years after practical completion.
Search the BPC’s practitioner register. Check that the registration covers domestic building work, since a commercial-only registration doesn’t authorise residential work, and that the registered name matches your contract.
A written contract required for domestic building work above a set threshold, governed by the Domestic Building Contracts Act 1995. The Domestic Building Contracts Amendment Act 2025 raises that threshold from $10,000 to $20,000, with regulations still being finalised.
It depends when your contract was signed and when your building permit was issued. Most of the schemes have specific commencement dates, so check against your own project dates.
Ready to build your dream home? Contact us today for a complimentary consultation and let's bring your vision to life.
Melbourne, Australia
Monday - Friday: 9:00 AM - 5:00 PM
Saturday: Closed
Sunday: Closed
By submitting this form, you agree to be contacted about your project. We respect your privacy.